We have Completed laying the first course of logs for the exterior walls as well as the interior walls. We have installed the buck at the door openings for the interior and exterior doors. On the second course we are cutting out for the electrical outlets above where we drilled through the logs for the wiring.
It looks so good seeing logs on the floor. It is actually starting to look like a house and it’s exciting to see the lay out of the rooms and a little peek at what the house is going to look like.
On the 4th course of logs we are leaving the window openings and building the buck for the window openings. On the inside corners the logs are all cut the same length. We are using the butt and pass on the interior walls but we are not allowing for an overhang. We are cutting the logs flush to each other.
Now it’s time to keep laying logs.